IEA-Bioenergy Task 42: Biorefining in a Circular Economy (Working Period 2016 - 2018)
The task deals with the analysis and dissemination of relevant information concerning biorefineries. In the last period the focus was on the development of an open-access tool for the TEE-evaluation (Technical/Economic/Environmental Assessment) of biorefineries.
IEA-DHC Annex TS2: Implementation of Low Temperature District Heating Systems
The potential of alternative heat sources is highest at low system temperatures, but current district heating networks are usually high-temperature systems. The aim of the IEA DHC Annex TS2 is to support the transformation of district heating networks towards lower temperatures (the so-called 4th generation). For this purpose, Annex TS2 forms an international platform that enables an exchange on the topics of technology, system, demonstration and competitiveness.
IEA-IETS Annex 15: Industrial Excess Heat Recover (Phase 2)
In the framework of IEA IETS Annex 15 potentials of excess heat and technologies for their integration were collected from national research projects, bundled and elaborated on. This way, a broad knowledge base was built on experience gained in carrying out surveys for potential use of excess heat. Experiences with questionnaires, process integration tools and extrapolation of data using existing knowledge about the respective energy systems were exchanged. A process database with detailed process information could also be established, which can be used for further research activities. Also, in the area of policy instruments, recommendations for future measures to increase the use of surplus heat were derived on the basis of national contributions.
IEA-IETS Task 19: Electrification of Industry
The electrification of industry can make a major contribution to CO2 reduction. The aim of the task was a transfer of knowledge between the international and the state levels. Nationally, the aim was to spread and establish the topic of “electrification of industry” through stakeholder involvement. A comparison of electrification based on roadmaps and resources was carried out and, above all, systemic aspects of electrification of industry were analysed.
IEA-ISGAN Annex 1: Global Smart Grid Inventory IEA-ISGAN and Annex 2: Smart Grid Case Studies
The international Smart Grid Action Network (ISGAN) aims to improve the understanding of Smart-Grid-technologies and to accelerate global deployment. The work in ISGAN is structured in eight standing working groups (annexes). The present project describes the Austrian contribution to Annex 1: Smart Grids Inventory and Annex 2: Smart Grids Case Studies.
IEA-ISGAN Annex 2: Smart Grid Case Studies (Working period 2019 - 2023)
The main objective of this working group of the International Smart Grid Action Network (ISGAN) is to provide all relevant stakeholders with access to detailed information on the current status of smart grid pilot and demonstration projects.
IEA-PVPS Task 13: Performance and Reliability of Photovoltaic Systems (working period 2010-2018)
The Task 13 provides a common independent platform whereby quality aspects of PV systems and its components are elaborated and exchanged amongst the stakeholders, and disseminates this knowledge to different market actors.
IEA-PVPS Task 13: Performance, Operation and Reliability of Photovoltaic Systems (Working period 2018 - 2021)
The IEA Task 13 develops independent, internationally valid analyses and recommendations for the operation and reliability of PV systems and their components. The continuation of the Austrian participation ensures the flow of information back to the Austrian photovoltaic industry through international cooperation and strengthens Austria as a location for innovation and production.
IEA-SHC Task 50: Advanced Lighting Solutions for Retrofitting Buildings
Retrofitting of non-residential buildings with energy efficient daylight and artificial lighting solutions can significantly contribute to reductions in electric energy consumption. However, appropriate technologies have to be made available to the stakeholders (investors, industry, consultants, designer) that are involved in the retrofitting process. Thus, system solutions for daylighting and artificial lighting were evaluated, simple rating and evaluation tools were developed and case studies that serve as best practice examples were monitored. The results were collected in the Lighting Retrofit Advisor, which helps stakeholders within the lighting retrofit process.
IEA-SHC Task 64: Solar Process Heat
The main objective of the task is to identify, verify and promote the role of SHIP (Solar Heat in Industrial Processes) systems as single system and in integrated energy systems. Technical and non-technical barriers will be tackled. The main results of the project are a dimensioning and integration guideline for SHIP and integrated energy systems and a Guideline to Market for SHIP and integrated energy systems.
IEA-SHC Task 65: Solar Cooling for the Sunbelt Regions
Without measures, cooling demand will triple by 2050. The aim of Task 65 is to adapt existing technologies to the boundary conditions of the sunbelt, to find suitable system concepts, to evaluate them and to disseminate the advantages. In addition to system adaptations, the Austrian focus is on life cycle cost-benefit analysis and the further development of existing assessment tools.
IEA-SHC Task 66: SOLAR ENERGY BUILDINGS - Integrated solar energy supply concepts for climate-neutral buildings and communities for the "City of the Future”
The energy supply for climate-neutral buildings is based on holistic system concepts that achieve high renewable fractions by intelligently combining technologies, sector coupling, high grid interaction and flexibilization measures. The Solar Energy Buildings Task supports exactly this development. The objective is to identify relevant stakeholders and their needs, to develop a technology portfolio and optimised integrated energy concepts and to give recommendations to policy makers and energy-related companies.
INFINITE: INnovative FINancing models for sustaInable urban energy sysTEms
The goal of the INFINITE-project is to lay the foundations for a more wide-spread implementation of urban energy supply systems across buildings, using renewable energy sources produced in local supply units. At the same time the projects supports to reduce the demand for fossil fuels and higher-level energy infrastructure.
INN'FIT4UM - Innsbruck "Fit4UrbanMission" - climate neutral Innsbruck 2030
Cities are the place where decarbonization strategies for energy, transport and buildings intersect. A few years ago, the municipality of Innsbruck set up a Smart City Group consisting of staff from the municipality, IIG, IKB and IVB to address this challenge. The goal of INN'F4UM is to develop a step-by-step plan to achieve climate neutrality for the city by 2030, building on an up-to-date representation of energy and resource flows together with the University of Innsbruck.
INNANET - Practice-oriented concept for implementation of industrial sustainability-networks
On the basis of conventional and recycling-oriented supply-chains and/or -networks a concept for the implementation of industrial sustainability networks will be developed. Together with a taskforce which needs to be founded a pilot implementation will be prepared.
INNERGY - Real laboratory in the central Inn-valley for climate-neutral semi-urban areas
Sustainable energy supply solutions for existing quarters and industry had been surveyed holistically and cross-sectorally in a small-structured area, consequently pilot projects had been elaborated with the aim to build up a climate-neutral region.
INReS - Integration of sustainable stormwater management tools into planning execution and management software (BIM)
Exploration to prepare and evaluate the applicability of an interactive web application to recommend appropriate stormwater management measures for existing and new buildings that allows for (1) BIM compatibility for object-based implementation and (2) simplified application in the form of the stormwater toolbox.
INTOKI- Methods and tools for consumers' and stakeholder involvement in the development of sustainable products and services
Supporting SME bakeries in the involvement process of their stakeholders in sustainability oriented product service innovation processes. Development and pilot testing of a dialogue oriented toolkit ("The INNOVATIVE Bakery Dialogue" Handbook).
IQ - focal point on information and networking in the field of energy efficient districts
Energy aspects on land use planning were worked up on the basis of research and demonstration projects in Austria, Germany and Switzerland. The target groups from administration, politics, architecture as well as developers and future dwellers were addressed with custom-made events.