Search results
There are 18 results.
IEA Action Network "Intelligent Energy Systems": International Smart Grid Action Network (ISGAN TCP)
ISGAN is an international network for the development and exchange of expertise on smart, clean, flexible and resilient power grids ("smart grids"). ISGAN provides a platform for the communication of international experiences, trends and insights for the implementation of smart grid solutions in decarbonized energy systems of the future.
IEA ISGAN Annex 3: Benefit/Cost Analyses and Tools of Smart Grids
Together with experts from 11 countries, the EI-JKU has analysed cost-benefit models and developed proposals for their adaptation and further development. In the course of the work, the EI-JKU dealt in particular with two questions: how such an evaluation model can be adapted to Austrian conditions and which socio-economic factors influence the question of whether an end consumer emerges as a winner or loser from Smart Grid-based functionalities.
IEA ISGAN Annex 5: Smart Grids International Research Facility Network (SIRFN). (Working period 2013-2018)
The Smart Grids International Research Facility Network (SIRFN) aims at improving the implementation of Smart Grids technologies by collaboration between smart grid testing facilities, test beds, and large-scale demonstrations. By active participation, Austria’s position and leading role on the forefront of international Smart Grids development has been strengthened.
IEA ISGAN Annex 5: Smart Grids International Research Facility Network (SIRFN). (Working period 2019-2021)
The Smart Grids International Research Facility Network (SIRFN) aims at improving the implementation of Smart Grids technologies by collaboration between smart grid testing facilities, test beds, and large-scale demonstrations. The focus during the working period 2019-2020 was laid on the implementation of extended interoperability tests and innovative laboratory testing methods for decentralised energy resources. By active participation, Austria’s position and leading role on the forefront of international Smart Grids development was strengthened.
IEA ISGAN Annex 5: Smart Grids International Research Facility Network (SIRFN). (Working period 2021-2022)
The Smart Grids International Research Facility Network (SIRFN) aims at improving the implementation of Smart Grids technologies by collaboration between smart grid testing facilities, test beds, and large-scale demonstrations. In the working period 2021-2022, the focus will be laid on the development of extended interoperability tests for decentralised energy resources and micro grids.
IEA ISGAN Annex 6: Electricity Transmission and Distribution Systems (working period 2021-2022)
ISGAN Annex 6 deals with the possible system-related challenges in the development of future smart grids. Austria is leading Task 4 Interaction of Transmission and Distribution Networks. The main topic in the work program relates to flexibility topologies within transmission and distribution grids. The results and analyses had been published on the one hand in a discussion paper and in condensed form in a video. Communication and dissemination activities were targeted and conducted to different stakeholder groups.
IEA ISGAN Annex 6: Power Transmission and Distribution Networks (working period 2019-2020)
ISGAN aims at enhancing the knowledge about Smart Grid Technologies and accelerating their international development. In this project, relevant findings from technical-scientific projects as well as successful approaches from national and international projects on the topic of interaction between transmission and distribution system operators were collected and analyzed.
IEA ISGAN Annex 6: Power Transmission and Distribution Systems (working period 2017 - 2018)
ISGAN aims at enhancing the knowledge about Smart Grid Technologies and accelerating their international development. The main objective of the Austrian participation in IEA ISGAN Annex 6 is to acquire knowledge and develop long-term concepts for the development of an intelligent electricity system, with the focus on the interaction of distribution and transmission networks.
IEA ISGAN Annex 7: Smart Grid Transitions (Working period 2020-2023)
ISGAN Annex 7 aims to bundle international experience and interdisciplinary research activities on smart grids, to synthesize them and to make them usable for policy makers. These include social, economic and humanities research on institutional framework conditions of transition, in particular on governance issues, as well as the development of processes for the broad participation of relevant stakeholders in smart grids transition processes.
IEA ISGAN Annex 7: Smart Grids Transition (Workingperiod 2017-2020)
ISGAN Annex 7 deals primarily with institutional and socio-technical issues in connection with the transition of the energy system, with smart grids at its core. It thus aims to bundle international experience and interdisciplinary research activities on smart grids, to process them and to make them usable for policy makers and stakeholders.
IEA ISGAN Working Group 6 Transmission and Distribution Network Systems (working period 2023-2024)
IEA ISGAN Working Group 6 addresses the challenges in the overall system of transmission and distribution networks for electricity. The results will improve the understanding of the impact of smart grid technologies on the overall system performance, transmission capacities and operational management of public electricity supply systems. In the project years 2022-2023, international pilot projects on flexibility use and the necessary interaction of transmission and distribution grid operators will be summarised and conclusions drawn.
IEA ISGAN Working Group 7: Smart grids transitions of the institutional change (Working period 2023-2026)
The aim of ISGAN Working Group 7 is to bundle international experiences and interdisciplinary research activities on smart grids, process them and make them usable for policy makers and regulators. These include social, economic and humanities research on the institutional framework conditions of the transition, in particular on governance issues, as well as the development of processes for the broad participation of relevant social groups in smart grid transition processes.
IEA ISGAN Working Group 9: Flexibility Markets - Development and Implementation (Working Period 2021 - 2023)
ISGAN Working Group 9 focuses on flexibilities in the power system and related market mechanisms. Main work areas include the integration of trading with flexibilities (redispatch), investigation of the needs of different market participants, identification and definition of flexibilities and their characteristics, development and scaling of interoperable flexibility markets, consumer-oriented understanding of flexibilities and the avoidance of stability or security losses due to diversity loss.
IEA ISGAN Working Group 9: Flexibility Markets - Development and Implementation (Working Period 2023 - 2025)
ISGAN Working Group 9 focuses on flexibilities in the power system and related market mechanisms. Main work areas include the integration of trading with flexibilities (redispatch), investigation of the needs of different market participants, identification and definition of flexibilities and their characteristics, development and scaling of interoperable flexibility markets, consumer-oriented understanding of flexibilities and the avoidance of stability or security losses due to diversity loss.
IEA International Smart Grid Action Network (ISGAN) Annex 6 on Power T&D Systems. Working period 2015 - 2016.
The International Smart Grid Action Network (ISGAN) aims in enhancing the knowledge about Smart Grid Technologies and accelerating the development and the international deployment. The main objective of the Austrian contribution in IEA ISGAN Annex 6 is to build up knowledge and long term concepts for the development of an intelligent and integrated electricity system, with the focus on the interaction of distribution and transmission networks, including the lead of the related subtask within the Annex.
IEA-ISGAN Annex 1: Global Smart Grid Inventory IEA-ISGAN and Annex 2: Smart Grid Case Studies
The international Smart Grid Action Network (ISGAN) aims to improve the understanding of Smart-Grid-technologies and to accelerate global deployment. The work in ISGAN is structured in eight standing working groups (annexes). The present project describes the Austrian contribution to Annex 1: Smart Grids Inventory and Annex 2: Smart Grids Case Studies.
IEA-ISGAN Annex 2: Smart Grid Case Studies (Working period 2019 - 2023)
The main objective of this working group of the International Smart Grid Action Network (ISGAN) is to provide all relevant stakeholders with access to detailed information on the current status of smart grid pilot and demonstration projects.
ISGAN Annex 7: Smart Grid Transitions – on Institutional Change
The International Smart Grid Action Network (ISGAN) aims at fostering the global implementation of Smart Grids. Annex 7 – Smart Grid Transitions deals with the related challenges regarding institutional change and socio-technical transition of the electricity systems.