EDEN - Developement of a structured data and preparation documentation with a minimized error-proneness for energy performance cerificates.
Current energy performance certificates hold major flaws. Therefore, the presented research initiative aimed at the development of a standardized and easy-to-use, generic Input-Data-Documentation, which ensures the quality of energy certificates for all involved stakeholders. During the development, the documentation had been conducted and for a chosen sample of representative buildings, which is expected to demonstrate the high potential of such a development.
E_PROFIL - neighborhood profiles for optimized energy transformation processes
E_PROFIL is a set of methods (an IT-supported toolkit) for the elaboration of neighbourhood profiles. The aim of the project is to facilitate an energy and resource efficient development in the planning practice of Austrian cities. Furthermore, the project is an important asset for research and planning activities in Europe and can also be applied to other neighbourhoods.
Efficient biogas processing with membrane technique
Production of natural gas substitute with a newly developed gas permeation technology. Optimization of the process with biogas from energy crops fermentation. Screening of new methods of online product gas quality control.
Electrical peak load in supermarkets - Strategies to improve energy efficiency
Levelling and reduction of electrical peak load in supermarkets by using additional energy storage systems and by managing the consumption of industrial refrigeration facicilties. Techno - economic feasibility study with high potential of replications via involved industrial partners.
Energy Counselling within 60 Minutes
Concept for a high quality, PC supported, 60 minutes energy counselling method, focusing on building refurbishment and new constructions, including a software tested in real counselling situations and a printed documentation.
Energy Performance Contracting (IEA DSM Implementing Agreement - Task X)
The objective of this task within the IEA DSM programme is to facilitate the use of performance contracts and other energy service company (ESCO) contracts. In this scenario, the ESCO has taken on the project's performance risk by guaranteeing a specified level of energy savings. Its compensation for this risk is directly tied to achieving savings. The financing for such a project could come from the ESCO, the equipment supplier or a third-party company.
Energy Services as an Integral Part of the Distribution
Concept development for the implementation of efficient energy services as part of grid connected energy supply to increase energy end-use efficiency.
Energy centre for the thermal conversion of biogenous raw materials and residues of a region to produce heat, electricity, SNG and liquid biofuels II
Production of synthesis gas from biological fuels and residues using steam blown gasification. This synthesis gas will be used for polygeneration especially for heat, power, gaseous and/or liquid fuels.
Energy park Micheldorf-Hirt
Co-operative merging of the energy supply for the Region of Micheldorf within an operating scheme and supply of energy produced through renewable resources. Sustainable, autarkic, economic energy park. Energy supply by renewable resources for the building of the energy autarkic region Micheldorf-Hirt
Energy services for the optimised summer utilization of district heating systems
Development of practicable energy services for the summer utilization of district heating systems with reference to existing technologies to improve the efficiency and potentialities for the integration of renewable energy.
Energy system - Industrial region
Analysis of success factors, restrictions and risks on the development and implementation process caused by the system integration of renewable energy technology in industrial regions with higher energy demand.
Energy-Sponge-Bruck (Energieschwamm Bruck an der Mur)
The aim of the exploration-study for the urban region Bruck/Oberaich "Energieschwamm Bruck" or "Energy-Sponge-Bruck" was to establish clear and stringent basics for a flexible development of the future energy system. Therefore an energy development concept as well as a cadaster for short-term implementation measures had been applied. The structured, Bruck-based approach acts as framework for a general energy-conception-method, valid for small and medium urban regions with 10,000 to 20,000 inhabitants.
Energy-self-sufficient district Güssing
Development of a concept that shows the possibility of changing the energy supply of a district from fossil to 100% renewable energy carrier
EnergyCityConcepts - Methods and concepts for the implementation of sustainable energy systems in cities
Two concrete model regions (small city Gleisdorf and urban city quarter Salzburg-Schallmoos) will be developed and tested using new methodical approaches (interdisciplinary urban and regional energy planning, modeling and simulation). Therefore, it is aimed to substantiate scenarios and concepts for the implementation of defined targets on technical, ecological and economic criteria.
FT-Biofuels in Austria
Development of a realistic concept for the production of Fischer-Tropsch-fuels from biomass in a size of about 200.000 to/a in Austria. Comprehensive evaluation of this concept with respect to available biomass resources, and economical and ecological benefits.
Fair market conditions for virtual power plants
Analysis of technical, economical and regulatory conditions to get fair terms under competition in the liberalised market for virtual power plants on renewable energy basis.
Feasibility study of innovative absorption heat pump processes
A feasibility study of innovative absorption heat pump processes for strategic orientation and further development of heat pumping technology and its applications.
Feed-in and system integration of biogas in existing gas grids
Method for assessment of technological aspects of biogas supply to existing gas grids. Definition of characteristic numbers for quantitative an qualitative analysis. Aspects of systems integration.
Field test of a virtual power Plant comprising 30 pellet-boiler fired micro-CHP modules
A virtual biomass plant comprising 30 micro-CHP-Modules, each of them integrated into an existing pellets-boiler in the Austrian region of eastern Styria is to be tested. The goal of this project is to gain experience and to introduce a new sustainable technology.
Further enhancement of biogas production in Vorarlberg and its use over the natural gas grid
Further enhancement of biogas production in Vorarlberg with the possible use over the natural gas grid; analysis of the potential availability of fermentation substrates; scenarios for the increase of production capacities in combination with existing plants; technical blueprint of realistic scenarios; economic feasibility of the described scenarios.